From spreadsheets to a board: importing any task list

A spreadsheet is a perfectly good way to track work, up to a point. Everyone can open it, it has no learning curve, and you can add a column for anything. The point where it stops working is usually the same: two people edit the same row, nobody is sure who owns the third line, and the dates live in a column that no one looks at until they have passed.

If you are at that point, DeliverGoals can read the sheet as it is. Save it as CSV, upload it on the import page with Spreadsheet selected, and review what was read before anything is created. The same route works for most tools that can export a CSV, such as monday.com, ClickUp, Smartsheet or Notion; most tools can export one, so check yours. The examples use the Northwind Studio demo workspace, which is fictional.

app.delivergoals.com/projects/import
Import a project, step 1 of 3: four choices for where the project is now (Asana, CSV export, selected; Trello, JSON export; Jira, CSV export; Spreadsheet, CSV export), then Get the file from Asana with three numbered steps (open the project, click the arrow next to its name and choose Export / Print then CSV, upload the file) and a drop area with a Choose a file button, .csv up to 20 MB, nothing created until you review it.
Choose Spreadsheet for any CSV that is not an Asana or Jira export. If the file turns out to be one of those, the importer reads it as such.

The columns it understands

Only one column is required: something that names the task. Everything else is used when it is there and ignored when it is not. Headers are matched without regard to case, and the first matching column wins.

What it becomesHeader names it recognisesNotes
Task title (required)Name, Title, Task, Task name, Summary, ItemRows without a name are left out and counted
Board columnStatus, Column, Section, List, Stage, Group, BucketEach distinct value becomes a column, ordered to do, then in progress, then done
AssigneeAssignee, Owner, Assigned to, Person, Responsible; plus Assignee email or EmailMatched to a colleague by email first, then by name when only one person has it
Start dateStart, Start date2026-12-01, 12/01/2026, 1 Dec 2026 and similar are all read
Due dateDue, Due date, Deadline, End date, DateAn impossible date is dropped, not guessed
DescriptionDescription, Notes, DetailsKept as plain text
PriorityPriorityP0–P4, urgent, high, medium, low, critical, minor
LabelsTags, LabelsSeparated by commas or semicolons
CompletedDone, Completed, Completed atyes, x, done, true, or a date
Story pointsPoints, Story points, EstimateA number
Checklist itemParent, Parent taskA row naming another row as parent joins that task’s checklist
DependencyBlocked by, Depends on, DependenciesBy the other row’s ID or name; loops are dropped
ReferenceID, Task IDUsed for parents and dependencies

The file can be separated by commas, semicolons (what Excel uses in much of Europe) or tabs; the header row decides. UTF-8 is expected, and a file saved by Excel in Windows-1252 is read too.

An example sheet

Here is a small event-planning sheet, the kind that lives in a shared drive. Note the mixed date formats and the half-empty columns; that is normal, and it imports.

TaskStatusOwnerDuePriorityTagsDone
Order the boothPlannedMaya Okafor2026-12-01P1events
Print flyersPlanned12/05/2026events, print
Write the talkIn progressDaniel Reyes3 Dec 2026highevents
Book the venueCompletePriya Nair2026-11-01yes

Uploaded, this becomes a project with three columns: Planned, In progress and Complete, which the importer recognises as a done column. Maya and Daniel get their tasks; the flyers have no owner and are left unassigned; “P1” and “high” both become High priority; the venue booking arrives completed.

How spreadsheet columns become board fields Your sheet The board Task Status Owner / Owner email Start, Due Priority Tags Done Card title Board column Assignee Timeline bar Priority Labels Completed matched to a colleague by email, then name a date in any common format P0–P4, high, low… yes, x, or a date
Each column in the sheet lands in one place on the board. Columns the importer does not recognise are ignored, not guessed at.

What the board gives you that the sheet did not

It is fair to ask why move at all. A spreadsheet that works should be left alone. These are the things that change, in the order teams usually notice them.

In the sheetA row anyone can edit

Ownership is a name typed in a cell. Dates are text. “Status” is whatever someone last wrote. Nobody is told when a row changes.

On the boardA card with one owner

Each task has one assignee, who is notified in the app. Moving a card is the status. Due dates turn amber and then red, and every change is in the task’s history.

app.delivergoals.com · Website Relaunch · Board
DeliverGoals board for the Website Relaunch project (NW-WEB, 16 tasks, 4 done, managed by Daniel Reyes): columns Backlog, To do, In progress, In review and Done; cards such as Build new navigation (DG-28, Engineering label, High, Tom Becker, due Tomorrow, 1 of 3 subtasks, 1 comment), Homepage hero and illustrations (Urgent, Aiko Tanaka, due Yesterday in red) and Checkout flow redesign (Design and Engineering labels, Urgent, Priya Nair, due Today).
The same kind of work on a board: columns are status, and each card carries its owner, priority, due date and checklist.

The list view is the closest thing to the sheet you left: rows grouped by column, with status, priority, owner and due date edited in place, and several rows changed at once.

app.delivergoals.com · Website Relaunch · List
List view of the Website Relaunch project grouped by column (Backlog 2, To do 5, In progress 3, In review 2): each row has the task code and name, labels, and drop-downs for status, priority and assignee, a due date field (11/14/2026 in red for Homepage hero and illustrations), a subtask count such as 1/3 and the created date, with a checkbox on every row.
The list view keeps the spreadsheet’s speed for bulk edits, with each field checked rather than free text.

Start and due dates become bars on the timeline, which is where most spreadsheets fall short. A sheet can hold dates; it cannot show you that three of them overlap next week.

app.delivergoals.com · Website Relaunch · Timeline
Timeline view of the Website Relaunch project from 1 November to 26 December 2026 on a weeks scale: bars from start date to due date labelled with the assignee, grouped by column; a vertical line on today, 15 November; Homepage hero and illustrations in red as overdue; diamond milestones for Beta open to customers on 22 November and Public launch on 6 December; a legend for Open, Done, Overdue and Milestone.
Start and due dates from the sheet become bars; milestones are diamonds, and the line is today.

Beyond the board itself, the team gets a daily written stand-up, a calendar and My tasks across projects, goals linked to the projects that deliver them, and a manager’s brief of what is stuck. None of that needs anything from the sheet beyond what is above.

Formulas and other things a sheet can hold

A cell can contain a formula. The importer never evaluates anything: a cell beginning with “=” arrives as text, exactly as written. When tasks are later exported from DeliverGoals to CSV, any cell a spreadsheet would treat as a formula is prefixed with an apostrophe, so it opens as text again. Colours, comments in cells, merged cells and multiple tabs are not read; export the one tab that holds the tasks.

Where it stops

It is a one-time import of one file, up to 20 MB and 5,000 tasks; changes made in the sheet afterwards do not follow. Custom columns beyond the ones above are not kept. People in the sheet are never invited or created: invite them first, and the importer matches them by email.

Shaping the sheet before you export

  • One row per task. Remove header blocks, totals and blank separator rows.
  • A status column with few values. Five or six distinct values become five or six columns; forty become forty.
  • Owner emails if you have them. Matching by email is exact; matching by name works only when one colleague has that name.
  • Real dates. “End of month” will be dropped; 2026-11-30 will not.

For a whole team’s move, including the order to do things in, see switching project tools in a week. The importer is described on Import & migration.

← All posts   Start a 14-day trial