The complete project cycle in DeliverGoals: from the first brief to the last task done

Most project tools are good at one stage of a project. Some are good at planning and poor at the daily grind; others are a fine to-do list with no way to tell whether the work adds up to anything. The cycle is the point: you start, plan, staff and run the work, then you find what is stuck, check it against what the company is aiming for, review the week and close it out. The next project starts with what you learned.

This guide follows that cycle end to end in DeliverGoals, one stage at a time, naming the screen each stage happens on. The examples come from the Northwind Studio demo workspace, a fictional studio of seven people: Maya Okafor (admin), Daniel Reyes and Sofia Rossi (managers), and Priya Nair, Aiko Tanaka, Tom Becker and Lucas Moreau (members). Daniel runs Website Relaunch for the fictional client Harbor & Finch, and has just brought Brand Refresh 2027 over from Asana.

The project cycle in eight stages1 StartNew, import or Plan with AI2 PlanBoard and timeline3 StaffMembers and owners4 Run the dayMy tasks, board, stand-up5 UnblockTeam brief6 MeasureGoals and forecasts7 ReviewDashboard and reports8 CloseComplete and exportOne projectstages 4 and 5 repeat every day6 and 7 every week
The eight stages. Start, plan and staff happen once per project; running the day and unblocking happen daily; measuring and reviewing happen weekly; closing happens once.

The cycle at a glance

StageScreenWhoHow often
1 StartNew project, Import, or Plan with AIManagerOnce per project
2 PlanBoard, list and timelineManagerOnce, then as the plan changes
3 StaffProject members; task assigneeManager (admin invites people)Once, then as people change
4 Run the dayMy tasks, board, task panel, stand-upEveryoneDaily
5 UnblockTeam brief and its Needs attention listManagerDaily, five minutes
6 MeasureGoals, key results, forecasts, check-insGoal ownersWeekly
7 ReviewTeam dashboard, reports, activity logManagerWeekly, twenty minutes
8 CloseProject status, list exportManagerOnce

1. Start: four ways to begin a project

A project in DeliverGoals has a name, a code, a colour, a manager, a client or “Internal”, and members. How its board fills up depends on where the work is coming from.

  • From nothing. New project, then a basic board (To do, In progress, Review, Done), a blank board, one of the built-in templates, or a project template your company saved from an earlier project.
  • From another tool. Import an Asana or Jira CSV, a Trello board’s JSON, or any task spreadsheet. You review everything before it is created.
  • From a brief. Describe the project in a few sentences and let Plan with AI draft the columns, tasks, dates, owners and dependencies. Again, you review first.
  • From another project. Import into an existing project you manage; columns with the same name are reused.
app.delivergoals.com · Projects
Projects page for a manager: tiles for 2 projects, 21 tasks with 16 still open, 24% completed and 9 seats; status tabs Active, On hold, Completed and Cancelled; cards for Customer Onboarding Revamp (NW-ONB, Internal, 1 of 5 done, 4 people) and Website Relaunch (NW-WEB, client Harbor & Finch, 4 of 16 done, 5 people), both Active and managed by Daniel Reyes.
Daniel’s projects page: each project with its code, client, status and progress from tasks done.

Daniel’s Brand Refresh project lived in Asana. He exported it as CSV and imported it: 14 tasks, five columns, six checklist items, fourteen dependencies and seven labels. Seven of the eight people in the file matched colleagues by email; the eighth, an outside freelancer, was left unassigned on purpose.

app.delivergoals.com · Import · Done
Import step 3 of 3: Brand Refresh 2027 is ready. Imported 14 tasks, 5 columns, 6 checklist items, 14 dependencies, 7 labels. 7 people were given their work and told about it. A warning that 1 task is unassigned because its owner was not matched to anyone in the company, with Open the board and Import another buttons.
The end of an import: what was created, and the one task that still needs an owner.

For a project with no history anywhere, Plan with AI is the quicker start. The draft is a proposal: untick what you do not want, rename tasks, then create.

app.delivergoals.com · Plan with AI · Draft
The drafted plan, 24 of 24 tasks starting 17 November: an Assumptions note (move weekend 9-10 January 2027; furniture ordered in the first week to arrive by about 5 January); a Planning & Approvals column with Draft floor plan (Sofia Rossi, High), Agree floor plan with landlord (Sofia Rossi, Urgent, after the draft), Draft move budget with quotes and Sign off move budget (Maya Okafor, Urgent); Furniture & Network with Order furniture (Sofia Rossi, Urgent), Plan network and Wi-Fi layout and Book network installer (Tom Becker, High). Each row has a checkbox, an editable title, dates, owner, priority and what it waits for; Change the brief and Create 24 tasks buttons.
A drafted plan for an office move: columns, owners, dates and what each task waits for. Nothing exists until Create is pressed.

The detail on both routes is on Import & migration and the AI page.

2. Plan: columns, dates, milestones, dependencies

The board’s columns are the stages work passes through. Keep them few and named for what happens in them: Website Relaunch uses Backlog, To do, In progress, In review and Done. Each task can carry a start date and a due date, a priority, labels and story points; a task with nothing to do of its own but a date that matters is a milestone.

Dependencies are where the plan becomes a plan. When “Checkout flow redesign” blocks “Beta open to customers”, the beta cannot honestly be on time if the redesign is not. The timeline shows the whole thing at once:

app.delivergoals.com · Website Relaunch · Timeline
Timeline view of the Website Relaunch project from 1 November to 26 December 2026 on a weeks scale: bars from start date to due date labelled with the assignee, grouped by column; a vertical line on today, 15 November; Homepage hero and illustrations in red as overdue; diamond milestones for Beta open to customers on 22 November and Public launch on 6 December; a legend for Open, Done, Overdue and Milestone.
Website Relaunch on the timeline. The vertical line is today; the red bar is late; the diamonds are the beta and the launch.

Read the timeline for two things: bars that run past a milestone they feed, and weeks where one person has three bars stacked. Both are cheaper to fix now than in week four. See Boards, lists & tasks, Timeline, calendar & My tasks and from due dates to a plan.

3. Staff: members, roles and owners

Every person has a role in the company (admin, manager or member) and is added to the projects they work on. Membership decides what they can open: a member of Website Relaunch does not see the board of a project they are not on. Admins invite people by email; each invitation is a personal link. The details are on People & security.

Then each task gets one owner. One, not “the design team”: a task with two owners is a task with none. When Daniel assigns a task, the owner is told in the app.

app.delivergoals.com · Notifications
The notifications panel open for Priya Nair, a member: 2 unread under New: Tom Becker mentioned you on Build new navigation (@Priya Nair can you check the mobile menu?) and Daniel Reyes assigned you Checkout flow redesign in Website Relaunch, each 11 minutes ago; behind it her dashboard with 3 projects, 4 tasks on her plate (1 overdue) and her stand-up posted.
Priya’s bell: an assignment from Daniel and a mention from Tom. Nobody is notified of their own actions.

4. Run the day: My tasks, the board, the task, the stand-up

Most of a project’s life is this stage, and most of it belongs to the people doing the work rather than the manager. A member’s day has three screens.

My tasks

One person’s work across every project, sorted by urgency rather than by project: overdue, due today, the next seven days, later. Ticking the circle completes a task without opening its board.

app.delivergoals.com · My tasks
My tasks for Priya Nair, a member: tiles for Open 4 in 2 projects, Overdue 0, Due today 1 and Next 7 days 2; then groups Due today (Checkout flow redesign, Website Relaunch, Urgent), Next 7 days (Migrate blog to the new CMS on 18 Nov; New onboarding flow, Mobile App 2.0, on 19 Nov) and Later (Push notification preferences on 23 Nov), each with a circle to tick it complete.
Priya’s four open tasks in two projects; one is due today.

The task itself

Detail lives on the task, not in chat: the description, a checklist of subtasks (or Generate with AI for a first draft of one), comments with @mentions, attachments, what it blocks, and the history of every change.

app.delivergoals.com · Task DG-31
Task panel for Checkout flow redesign (DG-31): a description, three subtasks with 1 of 3 done (33%) and a Generate with AI button, a comment from Priya Nair with Reply, and on the right status In progress, section In review, priority Urgent, assignee Priya Nair, due date 11/15/2026 marked Due soon, start date 11/06/2026 with a Milestone checkbox, 8 points, 60% progress, labels Design and Engineering, a dependency Blocking: Beta open to customers, and an attachments drop area.
Checkout flow redesign: one of three subtasks done, a comment from Priya, and the beta it is blocking.

The full journey of one task, from quick add to Done, is in the life of a task.

The stand-up

Each person writes three lines when their day starts: yesterday, today, and what is in the way. The manager reads them on one board instead of holding a call.

app.delivergoals.com · Team stand-up
Team stand-up board for Sunday, 15 November 2026: Posted 3 of 6 people, Missing 3, Need a hand 2 (blocked, flagged or overloaded), average mood blank because mood and workload are optional. A Needs your attention panel lists Aiko Tanaka (Hero is a day late, two rounds of feedback) and Priya Nair (Waiting on final pricing copy), each with a Respond button; a table below lists everyone with Missing or posted status; Share link and export controls at the top.
Three of six posted; two people need a hand and are pulled to the top.

How to run it well is in the ten-minute daily stand-up.

5. Unblock: the team brief

A manager’s job in stage 4 is mostly to stay out of the way. Stage 5 is where they earn their keep: find what is stuck and move it, every morning, in a few minutes. The Team brief puts the day on one page: who has posted, who is missing, who needs a hand, what finished, what is late, what is due soon, and which goals are heading for a miss.

app.delivergoals.com · Team brief
Team brief for Tuesday 17 November, 7 people on 4 projects. A Summary written by AI from the facts on the page, labelled as such, in six bullets: Aiko Tanaka and Priya Nair reported blockers; two tasks are overdue; two goals are at risk or off track; what is due soon; four of seven people have not posted; progress yesterday. Tiles: stand-ups posted 3/7, need a hand 2, overdue 2 with 4 due in 3 days, goals at risk 2. Below, Needs attention with 8 items, Still to post, Finished since yesterday and Due in the next three days.
Tuesday 17 November: 3 of 7 posted, 2 need a hand, 2 overdue, 2 goals at risk. The summary at the top is written by AI from these facts and labelled as such.

Underneath, Needs attention ranks everything that is stuck across all of the manager’s projects, most urgent first.

app.delivergoals.com · Team brief · Needs attention
Needs attention, 8 items, most urgent first: Homepage hero and illustrations is 2 days late (Late); Checkout flow redesign is 1 day late and holds up 1 other task (Holding others up); goal Ship Mobile App 2.0 to the pilot group is at risk, likely 89 days late at the current pace (Goal); goal Keep every client project inside its budget is off track (Goal); Interview 10 recent sign-ups is 3 days late; Priya Nair and Aiko Tanaka need a hand (Stand-up); Logo exploration has no owner (No owner). Beside it: still to post, finished since yesterday, due in the next three days.
Late work that holds other work up comes first; the imported logo task with no owner comes last.

Notice the last line: “Logo exploration has no owner”. That is the freelancer’s task from the Asana import, surfacing two minutes after it arrived. How to use the page is in the manager’s daily brief.

6. Measure: goals that follow the work

A finished board is not the same as a met goal. Website Relaunch exists to lift trial sign-ups; the board can be 100% done and sign-ups flat. So goals sit above projects. Each goal has an owner, a period and a status, and takes its progress from one of three places: key results (a start, a target and a current value), linked projects (tasks done in them), or the owner’s own figure.

Goals now carry a forecast: at the pace the linked work is actually being finished, will this goal land by its date?

app.delivergoals.com · Goals · Forecasts
Goals page with forecasts: average progress 37% across 4 goals, 2 on track, 1 at risk, 1 off track. Ship Mobile App 2.0 to the pilot group (Sofia Rossi, due 27 Nov 2026, 22%, measured by linked projects) shows Forecast: Likely 89 days late at the current pace in red; the other three goals show Forecast: Not enough history to forecast yet. Each card shows its key results or linked project and the latest check-in.
“Ship Mobile App 2.0 to the pilot group” is likely 89 days late at the current pace; the others do not have enough history yet to forecast.

The owner checks in weekly: a status and a sentence. See Goals and goals that measure themselves.

7. Review: once a week, the same three screens

Daily unblocking catches today’s problems. The weekly review catches trends: one person carrying too much for three weeks running, overdue work that keeps coming back, a backlog growing faster than it is finished.

app.delivergoals.com · Reports & analytics
Reports and analytics across 2 projects: 21 total tasks, 5 completed, a 24% completion rate and 3 overdue open tasks; tasks by status (Pending 9, In progress 7, Completed 5); tasks by priority (Urgent 3, High 9, Medium 8, Low 1); and a throughput chart of tasks created and completed per week for the last 8 weeks, 21 Sep to 15 Nov 2026.
Completion, overdue work and weekly throughput for the projects the manager can see.
app.delivergoals.com · Activity logs
Activity logs across all projects, newest first: 21 events in 2 projects; filters for Created, Updated, Moved, Assigned, Commented, Completed and Deleted; entries such as Daniel Reyes created Audit analytics events in Website Relaunch, 23 minutes ago; a search box and an Export button.
The activity log: who created, moved, assigned, commented on, completed or deleted what. Filter by type, search, export.

The routine is in a manager’s Monday and the screens are on Stand-ups & reports.

8. Close: finish it properly

Projects rarely end; they fade. Closing one on purpose is worth ten minutes:

  1. Sweep the board. Every task is either done, moved to a follow-up project, or deleted with a comment saying why. The list view’s bulk actions make this quick.
  2. Check the goal. Record a final check-in on the goal the project served, with the number it ended on.
  3. Keep a record. Export the list as CSV (formula-like cells are neutralised so the file opens safely in a spreadsheet) and the activity log, if the client or your own files need them.
  4. Mark the project completed. It leaves the active list but its board and history stay; you can reactivate it later.
  5. Write down one lesson for the next project’s first stage, while it is fresh.

Where each stage usually fails

Every stage has a typical failure. Knowing which one you are in tells you what to fix, and it is rarely the tool.

StageTypical failureWhat to look at
StartThe project starts as a heap of tasks with no shapeBegin from a template, an import or a drafted plan, then cut it down
PlanEvery task is due on the same FridayThe timeline: stacked bars and bars that run past a milestone
StaffTasks owned by “the team”The board filtered by Anyone; the brief’s no-owner items
Run the dayWork happens but the board does not moveThe activity log: are people touching cards at all?
UnblockBlockers are reported and nobody answersNeed a hand on the stand-up board; reply before ten
MeasureGoals are updated once a quarter, from memoryForecasts against the owner’s status; weekly check-ins
ReviewReports are read once and never comparedThe same three screens every Monday, week against week
CloseThe project fades instead of endingA swept board, a final check-in, the status set to completed

Most teams are strong in two or three stages and weak in the rest. A common pattern is a well-planned project (stages 1 and 2) that loses its way in week three because nobody reads the stand-ups (stage 5) and the goal is checked in December (stage 6). The cure is not more planning; it is the five minutes each morning and the twenty each Monday.

The rhythm of the cycle
  1. Once
    Start, plan, staff

    Import or draft the plan, set dates and dependencies, add members, give every task one owner.

  2. Daily
    Run and unblock

    Everyone works from My tasks and posts a stand-up; the manager reads the team brief and clears what is stuck.

  3. Weekly
    Measure and review

    Goal owners check in; the manager reviews workload, overdue work and throughput.

  4. Once
    Close

    Sweep the board, record the goal’s final figure, export what you need, mark the project completed.

Where the cycle has gaps today

Notifications and a morning digest can be emailed, but the brief, the reports and the weekly routine happen when people open them. Time is tracked on tasks and simple automation recipes run per project, but there are no sprints or burndown and no free-form rule builder; Plan with AI and the brief summary need AI to be enabled for the workspace. These are listed honestly on the features page.

Where to start

If you are moving from another tool, start with Import & migration and the guide for Asana, Trello or Jira, or the one-week migration playbook. If your work is in a spreadsheet today, start a board from one project, run stage 4 for two weeks, then add goals. Every stage above is part of the 14-day trial.