Moving a project from Asana to DeliverGoals

Moving a team from one project tool to another usually fails for small reasons: the dates did not come across, half the tasks lost their owners, or nobody could tell what the import had left out. This post moves one Asana project into DeliverGoals step by step, says exactly what maps to what, and is plain about what stays behind.

The example is Brand Refresh 2027, a fourteen-task project exported from Asana for the Northwind Studio demo workspace. Northwind Studio and everyone in it are fictional; the export was written for the demo using the demo team’s names, plus one outside freelancer, Jonah Pike, who has no account in the workspace. The screens are DeliverGoals as it runs today.

Before you start

  • Pick one project. The importer reads one Asana project per file. A workspace with ten projects is ten imports, which is also the sensible way to move: one team at a time.
  • Invite your people first. The importer never creates accounts or sends invitations. It matches each Asana assignee to someone already in your DeliverGoals company, by email. Invite the team before you import and almost everyone matches on the first try.
  • Be an admin or a manager. Members cannot import. If you are adding to an existing project, you must be able to manage it.
  • Tidy the project in Asana. Delete the tasks you would not want to see again. An import is a good moment to leave things behind.

Step 1: export the project from Asana

Open the project in Asana, click the arrow next to the project name and choose Export / Print → CSV. Asana downloads a .csv file with one row per task and per subtask. Do not open it in a spreadsheet and save it again; that can change dates and quoting. Upload the file as it came.

app.delivergoals.com/projects/import
Import a project, step 1 of 3: four choices for where the project is now (Asana, CSV export, selected; Trello, JSON export; Jira, CSV export; Spreadsheet, CSV export), then Get the file from Asana with three numbered steps (open the project, click the arrow next to its name and choose Export / Print then CSV, upload the file) and a drop area with a Choose a file button, .csv up to 20 MB, nothing created until you review it.
In DeliverGoals, open Projects → Import, choose Asana and drop the file. The steps for exporting are shown on the page for whichever tool you pick.

The file may be up to 20 MB and 5,000 tasks. It is read on the server and turned into a draft; nothing is created yet.

What maps to what

Asana concepts and what they become in DeliverGoals In the Asana CSV In DeliverGoals Section/Column Column on the board Tags Labels Rows with a Parent task Checklist items on the parent Blocked By (Dependencies) Dependencies Priority custom field Priority Assignee Email A colleague you confirm Completed At Completed, in Done Not carried: comments (not in Asana’s CSV), attachments, other custom fields, rules and forms
Each Asana column the CSV carries, and where it lands. The assignee is the one place you decide: the importer suggests a colleague and you confirm.
In AsanaIn DeliverGoalsCarried?
SectionsColumns, in the order they first appearYes
Task name and NotesTask title and descriptionYes
TagsLabels, with a colour eachYes
Subtasks (rows with a Parent task)Checklist items on the parent, ticked if doneYes
Blocked By (Dependencies)Dependencies between tasks; a loop is dropped with a warningYes
Start Date and Due DateStart and due dates, so the timeline works on day oneYes
A custom field called PriorityPriority: low, medium, high or urgentYes
Assignee and Assignee EmailA colleague matched by email, which you confirmYou confirm
Completed AtCompleted, and moved to a Done column if you wantYes
CommentsNot in Asana’s CSV export, so not carriedNo
AttachmentsNot copied; the CSV does not contain the filesNo
Other custom fieldsNot carriedNo
A task in several projectsImported once, into the project you are importingOnce

Step 2: review what was read

The review page shows the counts first, then asks where the work should go. Brand Refresh 2027 has 14 tasks (2 completed), 4 columns, 6 checklist items, 14 dependencies and 7 labels. It has no comments because Asana’s CSV does not include them.

app.delivergoals.com · Import · Review
Import review for asana-brand-refresh.csv: a note that nothing has been created yet and the draft is kept until the next day; tiles for 14 tasks (2 completed), 4 columns (14 with a due date), 6 checklist items (14 dependencies) and 0 comments (7 labels); Where should it go? with A new project selected and the name Brand Refresh 2027; Columns Research 4, Strategy 2, Design 3 and Rollout 5, and labels Research, Design, Strategy, Milestone, Rollout, Web and Social.
Fourteen tasks, four columns, six checklist items, fourteen dependencies. The project name comes from Asana’s Projects column and can be changed here.

Choose A new project to create one, with you as its manager, or An existing project you manage to add the tasks to it. When you add to an existing project, columns with the same name are reused and the others are added at the end.

Match the people

This is the step that decides whether the import feels finished. Every assignee in the file is listed with the number of tasks they own. Where their Asana email matches someone in your company, the colleague is already chosen and marked Matched by email. Where only the name matches, and exactly one person has that name, it is marked Matched by name. Anyone else is left unassigned.

app.delivergoals.com · Import · People
The People section of the import review: 7 of 8 matched to members of your company. Sofia Rossi, Daniel Reyes, Aiko Tanaka, Maya Okafor, Tom Becker, Lucas Moreau and Priya Nair each show Matched by email with their .example address, task count and a drop-down set to their own name; Jonah Pike, jonah@pikestudio.example, 1 task, is set to Leave unassigned. Below, Options: include completed tasks (2), put completed tasks in the Done column, include comments.
Seven of eight matched by email. Jonah Pike, the outside designer, is not in the workspace, so his one task will arrive without an owner.

You can change any match. You cannot pick someone outside your company; the server checks every choice again when you press Import. The matched people are added to the project as members and get one notification each for their open tasks.

Options and the first tasks

Three switches: include completed tasks, put completed tasks in a Done column, include comments (there are none from Asana). Below them is a table of the first tasks as they will arrive, with column, owner, priority and due date. Read it. If the dates look a month out, the export was saved by a spreadsheet with a different date order; export again from Asana.

app.delivergoals.com · Import · First tasks
The bottom of the import review: Options switches, then First tasks, a table of the 14 tasks with column, assignee, priority, due date and extras, such as Interview five long-standing clients (Research, Daniel Reyes, Medium, 20 Nov 2026, 2 checklist items), Logo exploration (Design, Jonah Pike, High, 18 Dec 2026) and Announce the new brand (Rollout, Daniel Reyes, Urgent, 29 Jan 2027); the two completed tasks are struck through. Discard and Import 14 tasks buttons.
The first tasks exactly as they will be created. Completed work is struck through.

Step 3: import

Press Import 14 tasks. Everything is created in one go: the project, columns, labels, tasks, checklists, dependencies, members and notifications. If anything fails, nothing is created, and the draft is still there to try again.

app.delivergoals.com · Import · Done
Import step 3 of 3: Brand Refresh 2027 is ready. Imported 14 tasks, 5 columns, 6 checklist items, 14 dependencies, 7 labels. 7 people were given their work and told about it. A warning that 1 task is unassigned because its owner was not matched to anyone in the company, with Open the board and Import another buttons.
One summary of what was created, and a note about the one task that still needs an owner.

Asana’s four sections became four columns, plus a Done column for the two completed tasks. Tags became labels on the cards. The interview task arrived with its two checklist items, one already ticked.

app.delivergoals.com · Brand Refresh 2027 · Board
The board created by the import: Brand Refresh 2027, 14 tasks, 2 done, managed by Daniel Reyes, with columns Research 2, Strategy 2, Design 3, Rollout 5 and Done 2. Cards keep their Asana tags as labels, priorities, owners and due dates, for example Interview five long-standing clients (Research, Medium, Daniel Reyes, Nov 20, 1 of 2 subtasks), Partner review of the direction (Strategy and Milestone labels, High, Maya Okafor, Dec 8), Logo exploration with no owner, and Announce the new brand (Urgent, Daniel Reyes, Jan 29); the two completed tasks are in Done.
The imported project as a board. Logo exploration, Jonah’s task, has no owner yet.

Because Asana had start and due dates, the timeline is useful immediately: research in November, design into December, rollout in January.

app.delivergoals.com · Brand Refresh 2027 · Timeline
Timeline of the imported Brand Refresh 2027 project from 3 November to 28 December 2026 on a weeks scale, grouped by column: bars for Interview five long-standing clients (Daniel Reyes), Competitor visual review (Aiko Tanaka), Brand positioning statement (Maya Okafor), Moodboards (Aiko Tanaka), Logo exploration and Colour and type system running into December; the January rollout tasks lie beyond the visible range; the two completed tasks show as green bars in early November; a line marks today, 17 November.
Start and due dates from Asana as bars on the timeline, with today marked.

After the import

  1. Invite the people who did not match. Then assign their tasks from the project’s List view, where you can select several rows and set the owner at once.
  2. Check the timeline. Look for bars that are missing (tasks with no dates) and for milestones. Asana’s CSV does not say which tasks are milestones; tick Milestone on those tasks yourself.
  3. Re-attach the files that matter. Attachments are not copied. Most projects have three or four documents worth moving; drag them onto the tasks.
  4. Freeze the Asana project. Archive it, or at least tell the team it is read-only. Two live copies of a plan is worse than either one.

What the importer does to keep you safe

  • Nothing is created until you review it. Upload, read, decide, then import.
  • People are never invited or created. Assignees are matched to your existing colleagues or left unassigned.
  • Links in the export are never fetched. Text is stored as text.
  • The uploaded draft is deleted once it is imported, discarded, or 24 hours old. Only the counts are kept as history.
  • Only admins and managers can import, and only into projects they manage.

What the Asana import does not do

It reads one project at a time from a CSV file; it does not connect to your Asana account. Comments are not in Asana’s CSV and do not come across. Attachments are not copied. Custom fields other than Priority, rules, forms, portfolios and goals stay in Asana. A task that lives in several Asana projects is imported once, into the project you are importing.

Moving a whole team rather than one project? A one-week migration playbook sets out the order. The importer itself is described on Import from Asana, Trello and Jira, and the other guides cover moving from Trello and moving from Jira.